Page not found

Search results

  1. General Plan Update- August 2016

    Community & Economic Development | Page

    Comment Letter 13 – Kasturi Shekhar...................................... 2-144 Responses to Comment ... Letter 14 – Shashi Shekhar....................................... 2-146 Responses to Comment Letter 15 ... PROGRAM............................................ 3-1 LIST OF TABLES Table 2-1 Index of Written ...

  2. Historic Preservation

    Planning | Page

    1994 Historic Resources (for reference only) Full Report Inventory List Image Slideshow Display ... Acknowledgments ii List of Figures iv Part 1: The Historic Resources Inventory and Historic Preservation ... their memories. 111 List of Figures Figure 1. Figure 2. Figure 3. Figure 4. Figure 5. Figure 6. Figure ...

  3. Age Friendly City Initiative

    Community Services | Page

    following up, but we feel like we’re being discriminated against and put on a wait list, since EPA is ... apply. • Develop and promote a list of vetted contractors or organizations that can help with minor or ...

  4. Residential Project Forms

    Building Services | Page

    be nonferrous (copper), listed, and not be less than ½” in diameter. The electrode shall be installed ... to panel) size is listed in the following table: GROUNDING ELECTRODE CONDUCTOR SIZING (Table 250.66) ... septic tanks. Permits are required prior to the demolition work. Following is a listing of the general ...

  5. JobTrain Office Project

    Planning | Project

    ‐121‐370. The project site is included on a  list ... the Chair or Planning Clerk calls  for public comment. Project  questions and comments can also be sent to the project planner per the contact information listed ... described in the Initial Study and included in the proposed project are listed below. Mitigated Negative ...

  6. Notice: Adoption of the Backflow Prevention and Cross-Connection Control Ordinance

    Public Works | Page

    lists, specific facilities in the City’s service area may be identified by directories, mailing lists ... outlet, never less than one inch. “Approved backflow prevention assembly” means assemblies listed, and ... installed as prescribed, on the most current List of Approved Backflow Prevention Assemblies, published by ...

  7. East Palo Alto Library

    Public Works | Project

    Workshop Structure Draft Concept Structural Narrative East Palo Alto Library Soft Cost Check List EPA ...

  8. 1933 Pulgas Avenue Pre-Application

    Planning | Project

    buildings, and other applications listed in Section 1.11 regulated by the Office of the State Fire Marshal, ... 1 9 3 3 P u l g a s A v e n u e, E a s t P a l o A l t o DIRECTORY VICINITY MAP RG-Architecture 428 South Van Ness Ave San ...

  9. Request for Bids- City Facilities Improvements (FA-02, FA-07, FA-13)

    Public Works | Bid/RFP

    your name and contact information to the Plan Holder's List for any updates regarding this ... ................................................................................................................................ 11 Subcontractor List ... Public Contract Code § 22300. 9. Subcontractor List. Each Subcontractor must be registered with the DIR ...

  10. 2012 Community Opinion Survey Report

    City Manager's Office | Page

    Contents.................................................................. i List of Tables.................................................................... iii List of ... Rounding............................................................. 36 Questionnaire & Toplines......................................................... 37 List ... Sample........................................... 33 List of Figures True North Research, Inc. © 2012 ivCity of East Palo Alto................ ...

Pages