Page not found

Search results

  1. Requests for Proposals- Professional As-Needed Arborist Consulting Services

    Community & Economic Development | Bid/RFP

    a statement that the proposal is a best and final irrevocable offer. List all subcontractors, if any. II. ... size of the vendor, range of service performed and include a list of all current clients. B. ... supervisory and management staff. C. References- Provide a list of not less than three (3) client references ...

  2. Requests for Proposals- Professional As-Needed Arborist Consulting Services

    Community & Economic Development | Bid/RFP

    a statement that the proposal is a best and final irrevocable offer. List all subcontractors, if any. II. ... size of the vendor, range of service performed and include a list of all current clients. B. ... supervisory and management staff. C. References- Provide a list of not less than three (3) client references ...

  3. Professional Design Services for Martin Luther King Park

    Parks and Recreation | Bid/RFP

      Funding for future improvements developed through the master planning process are on the  City’s Capital Improvement Project (CIP) unfunded list.    V. SCOPE OF WORK   ...   The scope of work outlined below is to be used as a general guide and is not intended to be a  complete list of tasks necessary to complete the project.     3   Project initiation  ... number and email address).  The City of east Palo Alto reserves the right to contact any  of the organizations or individuals listed ...

  4. 755 Schembri Lane

    Planning | Project

    pervious pavement? If YES, then fill out section G-3 on Worksheet G. Add to Municipal Inspection Lists (C.3 ... residential) Features that require source control Source Control Measures (Refer to Local Source Control List ... site-specific document showing soil type(s) on site If project uses the Bay Area Hydrology Model (BAHM), a list ...

  5. 739 Schembri Lane (APN063-361-260)

    Planning | Project

    Inspection Lists (C.3 and C.3.h) E F G G Is I.B.1.f greater than or equal to 5,000 sq.ft? (Or 10,000 sq.ft. ... residential) Features that require source control Source Control Measures (Refer to Local Source Control List ... Area Hydrology Model (BAHM), a list of model inputs and outputs. If project uses custom modeling, ...

  6. Urban Water Management Plan 2015 Update

    Community & Economic Development | Page

    UWMP and the associated public hearing. A total of 29 agencies and groups received notices as listed in ... notifications listed in this table are required to be sent to any city or county within which the water supplier ...

  7. On Call COVID-19 Facility Cleaning and Disinfecting Services

    Administration | Bid/RFP

    requirements listed at: https://www.cdc.gov/coronavirus/2019- ... the requirements described on CDC List N: Disinfectants for use against SARS-CoV-2. The proposal shall ... a firm and irrevocable offer. List all Page 4 of 10 subcontractors, if any. 2. Qualifications of Firm The ...

  8. Development Impact Fee Nexus Study and Financial Feasibility Analysis

    Community & Economic Development | Bid/RFP

    listed in Section III.A. All analyses shall comply with applicable law, including without limitation, the ... reports and documents, supplied by the City including, but not limited to, the items listed in Exhibit A. ... 3. Update the list of citywide CIP projects that qualify for funding with parks and trails, public ...

  9. Affordable Housing Strategy

    Housing | Page

    landlords to list all affordable housing projects and inclusionary units on Doorway, a new regional platform ... Housing Element period. ● Policy 4.4: Identify and maintain a list of at-risk units and substandard ...

  10. Planning On-Call Staff Augmentation RFP

    Planning | Bid/RFP

    1, shall include the service categories listed below, for development application review, staff ... staff to procure additional consultant services from the City’s approved list of qualified consultants, ...

Pages