Column 1
Column 2
Column 3
Column 2
Why is the city wasting water on the street median, also the parks are using way too much water , we are in a severe drought , stop watering!!
Left voicemail with Resident explaining that signs will be installed as part of SD-04 Street Sweeping Signage Project which should begin in summer 2021.
Left a message with the Resident requesting information on which street is in question.
Resident has been contacted. The potholes are on Caltrans ROW, request will be forwarded to them for response.
forwarded to Cal-West. ticket closed.
forwarded to Cal-West for repair. Ticket closed.
Dept: Public Works
Hi,
I live on McNair and work in the East Bay.
To get home (via Dumbarton Bridge and Highway 84), I have to turn left from University Ave onto
a) Bay Rd to get to Clarke Ave or Pulgas
b) Runnymede St
c) Bell St
d) Donohoe St
Public Works Maintenance crew, Amir & Adonis will repair the pothole on Wednesday April 28,2021 around 9am.
Ticket Comment
Left voicemail with Resident explaining that signs will be installed as part of SD-04 Street Sweeping Signage Project which should begin in summer 2021.